MD04(MPR) available quantity modification using BADI


Requirement

         In MD04 transaction for some material (If the material master MRP3 View availability check value is 'ZB' then) blocked stock need to exclude from available quantity.

Relevant exiting configuration

             Now in system, block stock consumption is activated in plant level. (Ex: Under plant 1000 any material have block stock, Then in MRP (MD04) available quantity will show (unrestricted stock + block stock)).

To fulfill this requirement below BADI is used.

BADI Name: MD_CHANGE_MRP_DATA
Implementation Name: ZMD_CHANGE_MRP_DATA
Method Name: CHANGE_MDPSX_MARD

Go to T-Code: SE19








Share this

Related Posts